Some of the most important work at a brewery never makes it onto a beer label. Behind our Williston brewery, years of planning, engineering and hands-on work have brought a new wastewater pretreatment system to life.

This is a story about our team sticking with a big project, and the engineers, contractors and local partners helping us see it through. It is part of how we care for the place where we brew.

More than 10,000 gallons treated

November 16, 2026. Our system is now receiving brewery wastewater and sending pretreated water onward to the municipal treatment system. More than 10,000 gallons have been treated during start-up: a meaningful new chapter in a project years in the making.

Project status note
Final adjustments and formal performance sampling are still ahead. This is an operating milestone, not yet a verified measure of treatment performance or completion of certification.

Blue exterior tanks and connecting pipework at Burlington Beer Company’s Williston brewery.

Exterior tanks and connecting pipework at our Williston brewery.

Wastewater treatment equipment, connecting pipework and control panels inside our Williston brewery.
Overhead view of water moving around two blue hoses inside the wastewater treatment tank at our Williston brewery.
Side view of the blue wastewater pretreatment tank and connecting pipework beside Burlington Beer Co.’s Williston brewery, November 2026.

Years in the making

The tanks are the visible part. Behind them is a much longer story of planning, problem-solving and people working together.

2018 · Building the foundation

Our first high-strength wastewater sidestream collection project was installed and operating by December. It created a separate path for concentrated brewing waste, laying groundwork for what came next.

2021–2022 · Planning the next step

Our team explored expanded collection capacity and worked through plans for a membrane bioreactor. Equipment layouts and engineering discussions turned a long-term need into a more detailed path forward.

2023 · Expanding collection

New sidestream tanks were installed by May, building on the collection infrastructure already in place.

2024–2025 · From plans to detailed design

Design agreements moved forward in 2024. By December 2025, the engineering team had delivered the completed Basis of Design, design drawings and operations plan.

Spring and summer 2026 · Bringing it together on site

Construction coordination was underway in May. By June, equipment was being organized and positioned at the brewery, bringing the drawings into the real world.

November 2026 · Water moving through the system

Start-up brought water moving between tanks and pretreated water flowing to the municipal system. By November 16, more than 10,000 gallons had been treated, with final adjustments and formal performance sampling still to come.

This work has brought our brewery team together with engineers, equipment specialists, contractors, operators and municipal partners over multiple years. We are grateful for the persistence and practical know-how that have carried it this far.

Wastewater treatment at Williston

Our new membrane bioreactor, or MBR, is designed to reduce the organic load in brewery wastewater before it reaches the municipal treatment system. It brings together biological treatment and membrane filtration.

How the system is designed to work

1. Collect and balance. Brewery wastewater is screened and balanced before treatment.

2. Biological treatment. Microorganisms use oxygen to break down organic material.

3. Membrane filtration. Membranes separate water from remaining solids.

4. Municipal treatment. The pretreated water continues through the sewer for municipal treatment.

THE MEMBRANE BIOREACTOR · MBR

Four stages. One connected system.

HOW IT’S DESIGNED TO WORK
Collection and balancing tankBrewery wastewater flows into a rectangular tank with three blue water lines, then continues toward biological treatment.

Brewery wastewater is screened and balanced before it moves into treatment.

A steady start
Biological treatment tankMicroorganisms and organic material are represented inside a tank. Blue aeration bubbles rise, supporting the biological treatment step.

With oxygen, microorganisms break down organic material in the wastewater.

Biology does the work
Membrane filtrationFour vertical membrane lines separate retained solids on the left from water passing through to the right. This is a simplified illustration, not a technical section of the equipment.

Water passes through membranes while remaining solids are held back.

Water moves through
Municipal wastewater treatmentPretreated water continues through the sewer to a municipal treatment building, represented by a pitched roof and two cylindrical tanks.

The pretreated water continues through the sewer for municipal treatment.

The next part of the journey
Water & aerationMicroorganisms & solidsOrganic materialIllustrative · Not to scale

Designed-process illustration. Particles, movement and timing are representative; this is not live operating data.

Keeping useful materials in use

High-strength yeast

We continue to keep high-strength yeast in a separate stream for use as fertilizer or feedstock for digesters.

Spent grain

After brewing, our spent grain is collected by a local hauler and sent to local farms for animal feed.